Case Study
client
AMG Resources
project
Various Works

ExCAL were engaged by AMG Resources to provide large sections of the information required for their IPPC permit application, including preparation of the site report, decommissioning/site closure plan, conducting noise surveys, and compiling the application.

In addition to the IPPC permit application work, ExCAL has conducted a number of projects on behalf of AMG Resources. A summary of the various surveys and assessments is given below:

  • A comprehensive COSHH assessment.
  • Annual mass balances including an assessment of water, fuel, raw materials, chemicals and energy. The results are provided to the Environment Agency.
  • Topographical surveys were undertaken and designs subsequently produced to enable concrete hardstandings to be installed.